Heat Treatment Line & Water System
Bradenburg, KY
Bronco’s work scope included:
Equipment Installation
Equipment OPI
Pipe Fabrication
Pipe Installation
Refractory
Scaffolding
Insulation
Metrology
Mechanical Turnover
Pre-commissioning
Startup
Managed Subcontractor:
Electrical Installation $8.9 mm Value
Tubemac Pipe System $2.2 mm Value
Furnaces
High Temp Furnaces – 591 Tons
Low Temp Furnaces – 684 Tons
Process Equipment
Entry Area HTF – 144 Tons
Multiflex Quench – 180 Tons
Transfer Bed #1 – 219 Tons
Transfer Bed #2 – 128 Tons
Eqpt Upstream of Plate Leveler – 31 Tons
Plate Leveler – 215 Tons
Eqpt Downstream of Plate Leveler – 17 Tons
Torch Cutting Area – 117 Tons
Water Treatment Area
8 cooling towers
4 Sand Filters
8 Tanks
22 Pumps
Process Pipe: Associated Utility Piping – 70,000 Linear Feet
Client:
Nucor
Contract Value:
$35 million
Manhours:
364,591
Safety record:
0 recordable incidents
Services:
Mechanical
Year:
2021