Heat Treatment Line & Water System

Bradenburg, KY


Bronco’s work scope included:

  • Equipment Installation

  • Equipment OPI

  • Pipe Fabrication

  • Pipe Installation

  • Refractory

  • Scaffolding

  • Insulation

  • Metrology

  • Mechanical Turnover

  • Pre-commissioning

  • Startup

Managed Subcontractor:

  • Electrical Installation $8.9 mm Value

  • Tubemac Pipe System $2.2 mm Value 

Furnaces

  • High Temp Furnaces – 591 Tons

  • Low Temp Furnaces – 684 Tons

Process Equipment

  • Entry Area HTF – 144 Tons

  • Multiflex Quench – 180 Tons

  • Transfer Bed #1 – 219 Tons

  • Transfer Bed #2 – 128 Tons

  • Eqpt Upstream of Plate Leveler – 31 Tons

  • Plate Leveler – 215 Tons

  • Eqpt Downstream of Plate Leveler – 17 Tons

  • Torch Cutting Area – 117 Tons

Water Treatment Area

  • 8 cooling towers

  • 4 Sand Filters

  • 8 Tanks

  • 22 Pumps

  • Process Pipe: Associated Utility Piping – 70,000 Linear Feet

Client:
Nucor

Contract Value:
$35 million

Manhours:
364,591

Safety record:
0 recordable incidents

Services:
Mechanical

Year:
2021